SLAB THICKNESS = 6.5 inch = 0.542 ft
EFFECTIVE DEPTH = 6.5 – 0.75=
5.75 inch
FLOOR FINISH =
25 psf
SELF-WEIGHT OF SLAB = 0.542 x150 pcf =
81.3 psf
TOTAL DEAD LOAD = 106.3 psf
LIVE LOAD =
42 psf
FACTORED LOAD (1.4DL+1.7LL) = (1.4 x 106.3 + 1.7 x 42) = 220.22
psf
STEP- 1: DETERMINATION OF
PUNCHING LOAD
Total Area =
19 ft 11 inch X 20 ft = 398.33 sft
Punching Area =
(18+5.75) X (18+5.75) inch = 3.92 sft
` Effective Area =
398.33 – 4.17 = 394.41 sft
Developed Punching Load, Vu = 394.41 x 220.22 = 86856.97 lb = 86.9 lb
STEP- 2: DETERMINATION OF
ALLOWABLE PUNCHING LOAD
Allowable Punching Load, ɸVc = ɸ4ƛb0d
Reduction Factor, ɸ =
0.85 (BNBC 2006 Table- 6.6.1)
Modification Factor, Æ› =
1 (Normal Weight Concrete)
Punching Perimeter, b0 = 4 x (18+5.75) =95 inch
Effective Depth, d =
6.5 – 0.75= 5.75 inch
Concrete Strength,
Allowable
Punching Load, ɸVc =
(0.85 x 4 x 1 x 95 x 5.75 x
SO, WE CAN CONCLUDE THAT FLAT SLAB OF
THIS BUILDING IS ADEQUATE FOR PUNCHING SHEAR.